Water Treatment Plant (4.0 MGD)

springhill_wtp
Client: City of Spring Hill
The water treatment plant has a design flow of 4.0 MGD with a peak flow rate capability of 6.0 MGD and consists of two infilco degremont superpulsator upflow clarifiers with four greenleaf filters, 520,000 gallon clearwell, chemical feed, gas chlorination/disinfection units, two 400 horsepower (2800 gpm each) high service pumps with variable frequency drives, one 40 horsepower (3,465 gpm) backwash pump, scada control system, laboratory, offices, restrooms, and electrical controls room all of which are enclosed within a 100ft x 150ft building. The site contains two backwash lagoons, a front entrance decorative water fountain and an emergency generator.

© 2016 Dempsey, Dilling and Associates, P.C. (DDA) Consulting Engineers.
All Rights Reserved
502 Hazelwood Dr, Smyrna, TN 37167
(615) 220-5800