Water Treatment Plant (1.0 MGD)

watertreatment1MGD

Client: Town of Estill Springs
This project consisted of converting an existing springhouse (finished water source) to a raw water source and construction of a 1.0 MGD water treatment plant. The spring water could no longer be utilized for drinking water without filtration, as the State of Tennessee had determined that the spring was under the influence of surface water runoff contamination of herbicides and pesticides. Services included the design of the raw water springhouse pumping facility, design of the 1.0 MGD water treatment plant, and construction administration services.