HWY 64 Bypass Roadway Improvements

bypassClient: City of Winchester
The project consisted of improvements to an existing roadway including a center turn lane with 5-foot shoulders, drainage improvements, water and sewer utility relocation and intersection signalization. This project was necessitated by the construction of the franklin county wide high school.

© 2016 Dempsey, Dilling and Associates, P.C. (DDA) Consulting Engineers.
All Rights Reserved
502 Hazelwood Dr, Smyrna, TN 37167
(615) 220-5800