Duplex Road Water Booster Station

waterboosterwaterbooster3

Client: City of Spring Hill
This project consisted of upgrading an existing booster station with two horizontal end suction pumps with 125 HP motors rated at 1395 GPM at 222-feet TDH each. An electrical room addition was added to the existing building. All existing piping was upgraded from 6-inch to 10-inch water lines. The pumps are controlled by a SCADA system tied to the city’s main SCADA control computer at the water treatment plant. The pumps also have variable frequency drives to control the pumping rate as needed. The booster station supplies water to the north side of the city and to the Northside and Buckner Road water storage tanks.

© 2016 Dempsey, Dilling and Associates, P.C. (DDA) Consulting Engineers.
All Rights Reserved
502 Hazelwood Dr, Smyrna, TN 37167
(615) 220-5800