Water Booster Station & 12” Water Line

shbypassClient: City of Spring Hill
This project consisted of a booster station building (30ft x 25ft) with two horizontal end suction pumps with 125 hp motors rated at 1440 gpm at 270-feet tdh each. The pumps are controlled by a scada system tied to the city’s main scada control computer at the water treatment plant. The pumps also have variable frequency drives to control the pumping rate as needed. The booster station is the main source of supplying water to the north side of the city and to the northside and buckner road water storage tanks. The project also consisted of approximately 16,000 l.f. of 12-inch water line.