Cory Daniel Hall, P.E.

 cory

PROJECT ENGINEER
DEMPSEY, DILLING & ASSOCIATES, P.C. ENGINEERING CONSULTANTS
502 Hazelwood Drive
Smyrna, Tennessee 37128

chall@dempseydilling.com


EDUCATION

Westark Community College, Fort Smith, AR. Fall 2000 – Spring 2002
University of Arkansas, Fayetteville, AR. Fall 2002 – Spring 2005
Bachelor of Science in Civil Engineering

CERTIFICATIONS/MEMBERSHIPS

Registered Engineer in Tennessee (#113401)
OSHA 10-Hour General Industry Safety and Health Certified
OSHA 10-Hour Construction Safety and Health Certified
TDOT Class 1 Concrete Testing Technician
Tennessee Erosion Prevention and Sediment Control Level 1 & 2 Certified
Member of Tennessee Association of Floodplain Management
TDOT Program Development Division CEI Certified
NAASCO Certified PACP User – Pipeline Assessment
Completed TDOT Local Programs Guidelines and ROW Training

COMPUTER SKILLS

Microsoft Word, PowerPoint, Excel, Outlook, AutoCAD, Autodesk Land Desktop, Hydraflow Storm Sewers, Hydraflow Hyrdographs, Bentley MicroStation, ArcMap, Lotus Notes, Adobe Acrobat.


PROFESSIONAL EXPERIENCE

January 2008 – Present DEMPSEY, DILLING & ASSOCIATES, P.C. Engineering Consultants

Project Engineer
Exercise judgment with regards to creating Construction Documents using MicroStation (Site, Grading, Demolition, Utility, Plan/Profiles, and Erosion Control Plans) with minimal supervision. Perform necessary hydraulic calculations for projects which include water, sanitary sewer, and storm sewer installation. Use ArcMap to develop data for local jurisdiction for storm water funding programs. Inspect State and Federally Funded Highway Project – Serve as construction inspector to monitor daily material installations, procedures, and safety. Prepare necessary ARAP documents for installation of utilities crossing blue line streams. Coordinate municipal projects through TDOT’s Locally Managed Projects Guidelines for State and Federally Funded Projects. Prepare the necessary documentation needed to complete the NEPA process for locally managed projects.

April 2007 – December 2007 CEI Engineering Associates, Inc. Nashville, TN Branch

Project Manager (Transferred to Nashville Office)
Exercise judgment with regards to creating Construction Documents using AutoCAD and Autodesk Land Desktop (Site, Grading/Drainage, Demolition, Utility, Plan/Profiles, and Erosion Control Plans and detention pond designs) with minimal supervision. Used local codes to create conceptual site layouts for various clients. Design sites to meet Erosion and Sediment Control standards for both state and local agencies. Prepare Storm Water Pollution Prevention Plans and permit submittals. Prepare Aquatic Resource Alternation Permits (ARAP) for sites as necessary. Coordinate plans and specifications with city, state, and local jurisdictions to construction document approval. Traveled to sites to conduct site investigations to determine a project’s feasibility and permitting process. Office coordinator for a nationwide client program. Responsible for ordering surveys, geotechnical reports, and environmental Phase I reports. Coordinated plans with both the client and governing jurisdictions for approval of plans. Work on projects within the local jurisdictions including churches and sub-divisions.

May 2005 – March 2007 CEI Engineering Associates, Inc. Bentonville, AR (Home Office)

CAD/Project Designer
Solely managed projects delegated to me for coordination and completion as part of a client’s nationwide program. Completed and coordinated construction documents. Traveled to conduct site investigation meetings with local agencies across the country. Conducted pre and post-construction erosion control inspections for client. Maintained company’s AutoCAD standards and documents for a national client.

PARTIAL LISTING OF MUNICIPAL/PRIVATE PROJECT EXPERIENCE

Town of Smyrna Gravity Sewer Line Rehabilitation Project, Smyrna (Rutherford County), TN
Served as project engineer for the rehabilitation of approximately 29,000 linear feet of gravity sewer line by method of pipe bursting and rehabbing of approximately 128 sewer manholes with a spray epoxy system. Project also included upsizing 8” sewer to 12” sewer by conventional trenching method. Performed field inspections to determine structural integrity of existing brick manholes and to verify sewer main locations. Prepared plans and profiles necessary for Tennessee Department of Conservation Division of Water Pollution Control approval. Project cost is $2.3 million.

Publix Grocery Store – State Hwy 99 & St. Andrews Drive, Murfreesboro (Rutherford County), TN
Project included complete site design and roadway improvements for the construction of a Publix grocery store, an additional strip building, and lease lots. Completed the site layout, grading and drainage plans, and utility plans. The improvements also required design of deceleration/turn lanes on State Hwy 99. The utility plan included layout and hydraulic analysis of both water and sewer to serve all buildings and lease lots.

Gracepointe Church – State Hwy 6 & Country Road, Franklin (Williamson County), TN
Project included the widening of State Hwy 6 at the intersection of Country Road for the installation of a left hand turn lane. Project also required the extension of a sanitary sewer line to service the church. Included as well was the replacement and relocation of an existing water line.

Harlinsdale Manor Subdivision – State Hwy 6, Franklin (Williamson County), TN
Harlinsdale Manor Subdivision – New subdivision connected to State Hwy 6 in Franklin, TN. The project included the design of a public road connecting into the state highway and the installation of all utilities through the subdivision. Served as project designer for all aspects of the project.

Winchester Downtown Revitalization Project – Winchester (Franklin County), TN
Project replaces the existing sidewalks around the square with the addition of landscaping. Project cost $1.4 million. Serving as the Construction Inspector to monitor material installation, construction safety, and installation procedures. Responsible for providing all necessary documentation of daily records and inspections.

Spring Hill Water Line Extension – Spring Hill (Maury County), TN
Project required the installation of a water line to serve an alternate fire flow protection source for the Target development complex constructed on State Hwy 6. Served as project designer for both layout and hydraulic calculations.

Cedar Stone Community Park – Smyrna (Rutherford County), TN
Large community park which included multiple ball field complexes, recreation play areas, and parking. Performed hydraulic calculations for both water and sanitary sewer lines to serve the park. Assisted with the storm sewer hydraulic design calculations

City of Winchester TDOT Surface Transportation Projects (STP) – Winchester (Franklin County), TN
Provided project oversight to guide the project from conception to construction through TDOT’s Local Programs Guidelines. Completed the necessary documents and coordination to obtain environmental clearance through the NEPA process. Coordinated construction plans with TDOT for approval. Obtained right-of-way, utility, and permit certifications to proceed to construction.

© 2016 Dempsey, Dilling and Associates, P.C. (DDA) Consulting Engineers.
All Rights Reserved
502 Hazelwood Dr, Smyrna, TN 37167
(615) 220-5800